We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Not every Baltimore, MD foundation crack needs the same material or approach. A vertical settlement crack behaves differently than a stair-step block crack, and we adjust injection technique and material to match what's actually happening in the wall.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Baltimore, MD job.
An actively leaking crack rarely waits for a convenient afternoon — we prioritize dispatch for Baltimore, MD cracks that are currently letting water in.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

Every Baltimore, MD Foundation Crack Repair job starts with an inspection, not a generic package — here's what that typically includes.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Polyurethane cures even in the presence of water, which makes it the right call for a crack that's actively letting water through.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Photos texted ahead of time help us prep for the visit and sometimes speed up scheduling.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Baltimore Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Baltimore Homeowner
"Appreciated the before-and-after photos for our records in case we ever need them for a future sale."
— Baltimore Customer
"Stair-step crack in our block wall had us worried about the whole foundation. Turned out to be isolated and fixable with injection."
— Baltimore Homeowner
Active leaks get flexible polyurethane regardless of classification, since stopping water intrusion is the immediate priority.
We repair cracks of nearly any size — hairline cracks are often the easiest and cheapest to seal before they widen further.
We make the call on-site after inspecting the crack, not before we've seen it.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Turnaround is usually fast enough to fit within a typical closing timeline.
We handle foundation crack injection throughout Baltimore and the surrounding Baltimore, MD service area, including the zip codes listed below.



Zip codes we serve in Baltimore, MD: 21218 21211 21210 21213 21212 21215 21214 21217 21216 21233 21231 21230 21239 21251 21209 21202 21206 21207 21205 21287 21201 21223 21224 21225 21226 21229 21203 21263 21264 21270 21273 21275 21278 21279 21281 21290 21297 21298 21250
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.